CDR SAMPLE FOR ENVIRONMENTAL ENGINEER
CAREER EPISODE 1
Restoration of BOP Single Point Mooring (SPM3) buoy and repair of 36” Pipeline
- Introduction
[CE 1.1]
Title:Restoration of BOP Single Point Mooring (SPM3) buoy and repair of 36” Pipeline
Duration: [Date] – [Date]
Location: [Location]
Organization: [Organization]
Position: Environmental Engineer
- Background
[CE 1.2]
I was tasked with the restoration of the BOP Single Point Mooring (SPM3) buoy and the repair of the 36″ pipeline. It was a critical project that required meticulous planning and precise execution.
[CE 1.3]
The first step was to assess the condition of the SPM3 buoy and the pipeline. I conducted thorough inspections and found significant damage to both structures. The buoy had suffered corrosion and mechanical wear, while the pipeline had developed several leaks and cracks.
[CE 1.6]Responsibilities:
- I worked on deploying the divers for inspecting the damaged sections up close and verifying the extent of the issue.
- I did the replacement of the corroded or cracked segments and ensuing the secured connections and proper alignment.
- I implemented the steps for the 36” pipeline repair.
- I worked on checking the corrosion, cracks, and dents signs during the inspection.
CAREER EPISODE 2
Complete design, fabrication, and installation of 4″ and 12″ pipes and Umbilical
- Introduction
[CE 2.1]
Title: Complete design, fabrication, and installation of 4″ and 12″ pipes and Umbilical
Duration: [Date] – [Date]
Location: [Location]
Organization: [Organization]
Position: Environmental Engineer
- Background
[CE 2.2]
I undertook the comprehensive responsibility of designing, fabricating, and installing 4″ and 12″ pipes, along with an umbilical system. This project required meticulous planning, precise execution, and coordination with a skilled team to ensure the successful completion of each stage.
[CE 2.6] Duties:
- With the design finalized, I moved forward with the fabrication process.
- I coordinated with specialized manufacturers and suppliers to procure high-quality materials, ensuring they met the required standards for strength, durability, and corrosion resistance.
- To commence the fabrication, I collaborated closely with reputable manufacturers and suppliers to source the necessary materials of the highest quality.
- I worked on ensuring the materials met the required specifications for strength, corrosion resistance, and durability was of utmost importance.
CAREER EPISODE 3
Removal and Installation of the boat landing to the wellhead, wellhead repairs, replacement of gratings on the cellar, spider and helideck
- Introduction
[CE 3.1]
Title: Removal and Installation of the boat landing to the wellhead, wellhead repairs, replacement of gratings on the cellar, spider and helideck
Duration: [Date] – [Date]
Location: [Location]
Organization: [Organization]
Position: Environmental Engineer
- Background
[CE 3.2]
I was tasked with the removal and installation of a boat landing to the wellhead platform. The first step was to carefully dismantle the existing boat landing, ensuring that all components were properly disconnected and secured. I made sure to follow the safety guidelines and used appropriate tools for the job.
[CE 3.6] Duties:
- I conducted a thorough inspection of the existing gratings.
- I carefully assessed their condition, looking for signs of damage, corrosion, or instability. Based on my evaluation, it was evident that the gratings required replacement to ensure a secure and reliable walking surface.
- I obtained the appropriate replacement gratings, ensuring they were specifically designed for marine environments and met the necessary safety standards.
- Before proceeding with the removal of the old gratings, I took the necessary safety precautions, including wearing personal protective equipment and securing the area.